---
title: "Public school gym renovation in Gdynia"
site: "Homepage"
description: "SkamoWall’s strength combined with its ability to improve the indoor climate was crucial for the gym renovation."
url: "https://skamowall.com/reference-projects/larger-buildings-where-skamo-wall-has-improved-the-indoor-climate/public-school-in-gdynia-poland/"
language: "en-US"
---

![Gdańsk6](https://skamowall.com/media/hoohwtc2/img_6382.jpg?width=1920&height=550&v=1da7f5597f6c2d0)

# Public school in Gdynia, Poland

Contractor: PHU FRONTEX Tomasz Dyczyj
Location: Gdynia, Poland
Building type: Public school
Project: Renovation
SkamoWall mounted: 285m²
Year: 2023

![Gdańsk1](https://skamowall.com/media/fbkp25l5/img_6388.jpg?width=1000&height=650&v=1da7f55829a02d0) ![Gdańsk2](https://skamowall.com/media/nhimuqam/img_6438.jpg?width=1000&height=650&v=1da7f558677d940) ![Gdańsk3](https://skamowall.com/media/yudo2zzp/img_6435.jpg?width=1000&height=650&v=1da7f558a117ac0) ![Gdańsk4](https://skamowall.com/media/224hkvzo/img_6448.jpg?width=1000&height=650&v=1da7f558f936440) ![Gdańsk5](https://skamowall.com/media/o3romzmt/img_6567.jpg?width=1000&height=650&v=1da7f5593a20eb0) ![Gdańsk6](https://skamowall.com/media/hoohwtc2/img_6382.jpg?width=1000&height=650&v=1da7f5597f6c2d0)

SkamoWall was chosen as the insulation material for the gym due to its good strength parameters. This decision was made not only to improve the building, but also to create an improved indoor climate.

A healthy indoor climate in the learning environment plays a crucial role in student well-being and performance. SkamoWall not only ensures better insulation and strength, but also a comfortable and healthy environment that promotes concentration, learning and well-being. Such a choice not only serves the needs of the building, but also the overall goal of creating optimal conditions for teaching and development.

# Moisture problems you want explained?

Speak to experts who understand moisture issues
